(1)
Darminawati, L.; Aldillah, A. Z.; Pranata, E. F.; Gusniawan, P. V.; Chumaidi, A.; Takwanto, A. PERHITUNGAN KARYAWAN PROSES PERANCANGAN PABRIK DISPROPORSIONATED ROSIN DARI GONDORUKEM GRADE WW DENGAN KAPASITAS 3.150 TON/TAHUN MENGGUNAKAN METODE ASETONISASI. Distilat: J. Tekn. Sep 2023, 9, 372-380.