[1]
L. Darminawati, A. Z. Aldillah, E. F. Pranata, P. V. Gusniawan, A. Chumaidi, and A. Takwanto, “PERHITUNGAN KARYAWAN PROSES PERANCANGAN PABRIK DISPROPORSIONATED ROSIN DARI GONDORUKEM GRADE WW DENGAN KAPASITAS 3.150 TON/TAHUN MENGGUNAKAN METODE ASETONISASI”, Distilat: J. Tekn. Sep, vol. 9, no. 4, pp. 372–380, Dec. 2023.