The implementation of building construction projects, especially Project X, is quite complex and costly in terms of time and expenses. Of course, in project implementation, the factors of planning and controlling time and costs are crucial to the project's success. Therefore, this study aims to evaluate time and expenses using the EVA method. In this context, EVA is used as a method considered sufficiently effective and efficient in analyzing time and cost evaluations for project completion. The findings of this study indicate that the project contract value is IDR 638,553,623,000, with an SPI value of 0.738 in week 84, while the CPI value in week 84 is 0.932. In terms of time, there is a deviation from the established standard of 2 years and 6 months of implementation. From these two aspects, it can be concluded that the time and cost set at the beginning of the project refer to delays in implementation and cost overruns in this project, so the existing implementation methods must be changed, especially project performance and cost payments, which must be carried out on time and in accordance with the plan.
Keywords
Article Details
References
- REFERENCE
- Arifiani , N. F. (2020). Analisis Kinerja Proyek dengan Menggunakan Metode Earned Value. 1(1).
- Ervianto , I. W. (2023). Manajemen Proyek Konstruksi (Edisi Terbaru). Yogyakarta: Andi.
- Husen , A. (2011). Manajemen Proyek. Yogyakarta, DIY: CV. Andi Offset.
- Nurtsani , R. A., Septiadi , D. R., & Suharyanto, S. (2017). Pengendalian Biaya dan Waktu Proyek dengan KOnsep Nilai Hasil (Earned Value). Jurnal Karya Teknik Sipil , 6(4), 460 - 470.
- Rantung , A. H., Sompie, B. F., & Mandagi , R. J. (2014). Analisis Pengendalian Biaya Dan Jadwal Pada Tahap Pelaksanaan Konstruksi Dengan “Analisis Nilai Hasil” (Earned Value Analysis). jurnal Ilmiah Media Engineering, 4(3), 14.
- Ridwan, A., & Ajiono, R. (2017). Pengendalian Biaya dan Jadual Terpadu Pada Proyek Konstruksi. Jurnal Ilmiah Teknik Sipil, 12(2), 74 - 83.
- Septiyanto , Y. I. (2018). Evaluasi Kinerja Waktu dan Biaya Pada Proyek Konstruksi Gedung Asrama Sekolah dengan Pendekatan Eva dan Percepatan Proyek dengan PDM. Universitas Brawijaya, Fakultas Teknik , Malang.
- Soeharto , I. (1999). MANAJEMEN PROYEK (Dari Konseptunal Sampai Operasional) (Vol. Jilid 1). Jakarta , DKI: ERLANGGA.
- Soemardi , B. W., Wirahadikusumah, R., Abduh, M., & Pujuartanto, N. (2007). Konsep Earned Value untuk Pengelolaan Proyek Konstruksi . Makalah. Fakultas Teknik Sipil dan Lingkungan, Institut Teknologi Bandung, 1 - 13.
- Sunatha , I. N., Lestari, I. A., & Soneta, Y. A. (2021). Analisis Optimalisasi Waktu Kegiatan Pada Proyek Pembangunan Gedung C Smpn 14 Denpasar Dengan Microsoft Project 2007. Jurnal IlmiahK.
- Wirabakti , D. M., Abdullah , R., & Maddeppungeng, A. (2014). Studi Faktor-Faktor Penyebab Keterlambatan Proyek Konstruksi. Jurnal Konstruksia, 6(1), 15.
References
REFERENCE
Arifiani , N. F. (2020). Analisis Kinerja Proyek dengan Menggunakan Metode Earned Value. 1(1).
Ervianto , I. W. (2023). Manajemen Proyek Konstruksi (Edisi Terbaru). Yogyakarta: Andi.
Husen , A. (2011). Manajemen Proyek. Yogyakarta, DIY: CV. Andi Offset.
Nurtsani , R. A., Septiadi , D. R., & Suharyanto, S. (2017). Pengendalian Biaya dan Waktu Proyek dengan KOnsep Nilai Hasil (Earned Value). Jurnal Karya Teknik Sipil , 6(4), 460 - 470.
Rantung , A. H., Sompie, B. F., & Mandagi , R. J. (2014). Analisis Pengendalian Biaya Dan Jadwal Pada Tahap Pelaksanaan Konstruksi Dengan “Analisis Nilai Hasil” (Earned Value Analysis). jurnal Ilmiah Media Engineering, 4(3), 14.
Ridwan, A., & Ajiono, R. (2017). Pengendalian Biaya dan Jadual Terpadu Pada Proyek Konstruksi. Jurnal Ilmiah Teknik Sipil, 12(2), 74 - 83.
Septiyanto , Y. I. (2018). Evaluasi Kinerja Waktu dan Biaya Pada Proyek Konstruksi Gedung Asrama Sekolah dengan Pendekatan Eva dan Percepatan Proyek dengan PDM. Universitas Brawijaya, Fakultas Teknik , Malang.
Soeharto , I. (1999). MANAJEMEN PROYEK (Dari Konseptunal Sampai Operasional) (Vol. Jilid 1). Jakarta , DKI: ERLANGGA.
Soemardi , B. W., Wirahadikusumah, R., Abduh, M., & Pujuartanto, N. (2007). Konsep Earned Value untuk Pengelolaan Proyek Konstruksi . Makalah. Fakultas Teknik Sipil dan Lingkungan, Institut Teknologi Bandung, 1 - 13.
Sunatha , I. N., Lestari, I. A., & Soneta, Y. A. (2021). Analisis Optimalisasi Waktu Kegiatan Pada Proyek Pembangunan Gedung C Smpn 14 Denpasar Dengan Microsoft Project 2007. Jurnal IlmiahK.
Wirabakti , D. M., Abdullah , R., & Maddeppungeng, A. (2014). Studi Faktor-Faktor Penyebab Keterlambatan Proyek Konstruksi. Jurnal Konstruksia, 6(1), 15.