[1]
Soedjarwanto, N., T Rausyan Hilmy, Komalasari, E. and Zebua, O. 2024. Analisis Commissioning Pembangkit Listrik Tenaga Surya Kapasitas 20.5 kWp On Grid PT. Quickprint Office. Jurnal Teknik Ilmu dan Aplikasi. 5, 2 (Jun. 2024), 47–52. DOI:https://doi.org/10.33795/jtia.v5i2.4823.