[1]
Arystianto, D.P., Karom, I.D., Kurniawan, D.D. and Oktaviandra, K. 2026. INTEGRATED PROJECT CONTROL STRATEGY IN HIGH-COMPLEXITY HOSPITAL CONSTRUCTION: A CASE STUDY OF HARAPAN KITA HOSPITAL PROJECT. Prokons: Jurnal Teknik Sipil. 20, 1 (Feb. 2026), 43–49. DOI:https://doi.org/10.33795/pjts.v20i1.9621.