Main Article Content

Abstract

The LRT Jakarta Phase 1B Zone 1 Velodrome – Manggarai construction project is a project owned by PT. Jakarta Propertindo (PERSERODA) which is located on East Jakarta, District Pulo Gadung and Matraman. This project consists of 103 piers with a length of 3,6 km. This  project will be implemented in the middle of a densely populated road surrounded by high-rise buildings, schools, and a university with limited construction area. So that we need project planning for this project to determine the appropriate organizational structure, site layout, implementation method, quality and safety planning, implementation budget, implementation time. To create project planning there are some required data, such as shop drawing, work plan document and requirements, and DKI Jakarta unit price document 2023. The result of project planning that have been prepared are the organizational structure used is a functional type of organization, site layout consist of 10 temporary facilities the planning of which is divided into 2 alternatives and traffic management has 2 access doors, namely entrance and exit for each section, the implementation strategy uses zoning, Quality planning consists of Standard Operational Procedure (SOP), and For safety planning consists of K3L, organizational structure, Hazard Identification Risk Assessment and Risk Control (HIRARC), General Program, and K3 Supporting Equipment, Implementation Time 843 Calendar Days with a total implementation budget of Rp. 453.955.638.849,71.

Keywords

perencanaan proyek jadwal metode pelaksanaan biaya mutu

Article Details

References

  1. A. A. Kadzafi, M. Khamim, and Marjono, “PENYUSUNAN PROJECT PLANNING PEMBANGUNAN JALAN TOL BALIKPAPAN – SAMARINDA SEKSI 2.2,” pp. 195–201, Sep. 2021, Accessed: Dec. 30, 2024. [Online]. Available: http://jos-mrk.polinema.ac.id/
  2. M. Dzikril Akbar, A. Sugiarto, M. Manajemen Rekayasa Konstruksi, J. Teknik Sipil, P. Negeri Malang, and D. Manajemen Rekayasa Konstruksi, “PROJECT PLANNING PROYEK PEMBANGUNAN APARTEMEN CAMBIO LOFTS TANGERANG SELATAN,” Sep. 2021. [Online]. Available: http://jos-mrk.polinema.ac.id/
  3. W. I. Ervianto, “Manajemen Proyek Konstruksi Edisi Ketiga,” Manajemen Proyek Konstruksi-Edisi Revisi, p. Edisi Revisi, Andi, Yogyakarta, 2005, [Online]. Available: http://katalog.kemdikbud.go.id/index.php?p=show_detail&id=91316
  4. I. Dipohusodo, “MANAJEMEN PROYEK & KONSTRUKSI,” 1996.
  5. I. Widiasanti and Lenggogeni, “Manajemen Konstruksi,” Feb. 2013.
  6. P. Buulolo, “Fungsi Organisasi dalam Manajemen Proyek,” PARETO: Jurnal Riset Bisnis dan Manajemen, vol. 6, pp. 7–5, Sep. 2021.
  7. A. Husen, “Manajemen Proyek: Perencanaan, Penjadwalan, dan Pengendalian Proyek, Edisi Revisi,” Yogyakarta: Andi, p. 253, 2011.
  8. Daryanto, Keselamatan Kerja Bengkel Otomotif / Drs. Daryanto. Jakarta: PT Bumi Aksara, 2001.
  9. F. Ramadhan, Analisis Kesehatan dan Keselamatan Kerja (K3) Menggunakan Metode Hazard Identification Risk Assessment and Risk Control (HIRARC). 2017.
  10. Mahyuddin et al., “Manajemen Proyek Konstruksi,” 2023.