Optimasi Perencanaan Pembangkit Listrik Tenaga Surya Atap On-Grid Melalui Simulasi PVsyst
DOI:
https://doi.org/10.33795/elposys.v12i3.8676Keywords:
On-Grid Rooftop, Solar Power Plant, PVsyst, Renewable EnergyAbstract
This study addressed the critical issue of Indonesia's persistent dependence on fossil fuels and the urgent need to accelerate New and Renewable Energy (NRE) adoption. The purpose of the research was to develop a comprehensive technical plan for a 1.202 kWp grid-tied rooftop photovoltaic (PV) system at a manufacturing facility in Karawang. The methodology employed a systematic approach consisting of site surveys, electrical configuration design (stringing, cabling, and protection systems compliant with PUIL 2020), and verification through PVsyst simulation software. Important findings revealed that the designed system projected an annual energy yield of 1,624,801 kWh with a Performance Ratio (PR) of 76.1%. The implications of this research suggested that the proposed rooftop PV system is technically robust and provides significant economic and environmental benefits, including an estimated annual revenue of IDR 1.68 billion and a reduction of 1,348.58 tons of CO2 emissions. These results demonstrated that large-scale industrial rooftop PV systems are a viable solution for achieving national energy transition goals
References
O. Bosman and R. D. Putra, “Arah pembangunan energi terbarukan di Indonesia pada era presiden Joko Widodo,” Energy Justice, vol. 1, no. 1, pp. 51–64, 2024, doi: 10.61511/enjust.v1i1.2024.701.
I. Kurniawan, R. Ichwani, R. Fionasari, A. Batubara, and A. Huda, “Indonesia’s Renewable Energy Outlook: What to Expect in The Future Renewable Energy of Indonesia. A Brief Review,” Elkawnie, vol. 8, no. 2, p. 298, 2022, doi: 10.22373/ekw.v8i2.18738.
S. Amin and W. Agus Nurtiyanto, “ANALYSIS OF HOUSE ROOF PLTS BASED ON THE PVSyst APPLICATION IN HOUSING IN BANJAR SERANG DISTRICT ANALISA PLTS ATAP RUMAH BERBASIS APLIKASI PVSyst DI PERUMAHAN BANJAR SERANG REGENCY,” J. Sci. Res. Dev., vol. 6, no. 1, pp. 735–754, 2024, [Online]. Available: https://idm.or.id/JSCR/inde
SUHENDAR, Dasar Dasar Perencanaan Pembangkit Listrik Tenaga Surya. Media Edukasi Indonesia (Anggota IKAPI), 2022.
Samsurizal, K. T. Mauriraya, M. Fikri, N. Pasra, and Christiono;, Pengenalan Pembangkit Listrik Tenaga Surya (PLTS). Jakarta: INSTITUT TEKNOLOGI PLN, 2021.
A. Rachmi, B. Prakoso, Hanny Berchmans, I. Devi Sara, and Winne, “Panduan Perencanaan dan Pemanfaatan PLTS atap di Indonesia,” PLTS Atap, p. 94, 2020.
B. Rudiyanto, R. E. Rachmanita, and A. Budiprasojo, Dasar-Dasar Pemasangan Panel Surya. Unisma Press, 2023.
R. Bagus, PV MINI-GRID INSTALLATION Dos & Don’ts. Eschborn, Germany: Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH Energising Development, 2021.
J. Good and J. X. Johnson, “Impact of inverter loading ratio on solar photovoltaic system performance,” Appl. Energy, vol. 177, pp. 475–486, 2016, doi: 10.1016/j.apenergy.2016.05.134.
I. Jamil, H. Lucheng, S. Habib, M. Aurangzeb, A. Ali, and E. M. Ahmed, “Performance Ratio Analysis Based on Energy Production for Large-Scale Solar Plant,” IEEE Access, vol. 10, no. January, pp. 5715–5735, 2022, doi: 10.1109/ACCESS.2022.3141755.
A. Burhandono, J. Windarta, and N. Sinaga, “Perencanaan PLTS Roof Top On-Grid Untuk Gedung Kantor PLTU Amurang Sebagai Upaya Mengurangi Auxiliary Power dan Memperbaiki Nilai Nett Plant Heat Rate Pembangkit,” vol. 3, no. 2, pp. 61–79, doi: 10.14710/jebt.2022.13051.
E. A. Karuniawan, F. A. F. Sugiono, P. D. Larasati, and A. R. Pramurti, “Analisis Potensi Daya Listrik PLTS Atap di Gedung Direktorat Politeknik Negeri Semarang Dengan Perangkat Lunak PVSYST,” J. Energy Electr. Eng., vol. 4, no. 2, 2023.
Harmiansyah, “Perancangan Sistem PLTS on Grid pada Asrama Mahasiswa TB 2 Institut Teknologi Sumatera Menggunakan Software PVSyst,” vol. 9, no. 2, pp. 184–191, 2023.
E. Sayoga et al., “Analisis Sistem Dan Hasil Simulasi Perencanaan PLTS On-Grid Pada Gedung SMA SULUH Jakarta Menggunakan Software PVSyst,” pp. 1664–1671, 2023.
S. N. Indonesia, “Persyaratan Umum Instalasi Listrik ( PUIL ) 2020 – Bagian 1 : Pendahuluan , prinsip fundamental dan definisi,” pp. 1–850, 2020.
T. Australian, “AS/NZS 3008.1.1:2009 Australian / New Zealand Standard TM Electrical installations — Selection of cables up to and including 0 . 6 / 1 kV — Typical Australian installation conditions,” vol. 2009, no. 1, 2009.
Badan Standardisasi Nasional, “Penjelasan Persyaratan Umum Instalasi Listrik 2011,” DirJen Ketenagalistrikan, vol. 2011, no. PUIL, pp. 1–133, 2011.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Elposys: Jurnal Sistem Kelistrikan

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.