Pengaruh Kopel 20 kV Antar Trafo terhadap Proteksi dan Keandalan Distribusi

Authors

  • Yudha Adhe Widodo Universitas Merdeka Malang
  • Resi Dwi Jayanti Kartika Sari Universitas Merdeka Malang
  • Rahman Arifuddin Universitas Merdeka Malang

DOI:

https://doi.org/10.33795/elposys.v13i1.9210

Keywords:

Substation, Power Transformer, 20 kV Coupler, Load Transfer, System Protection, Distribution Reliability

Abstract

Lumajang Substation operates three power transformers; however, to date, a 20 kV coupling system between Transformer 2 and Transformer 3 has not yet been implemented. The absence of this coupling potentially leads to transformer overloading, protection coordination mismatch, and reduced reliability of the power supply. This study aims to analyze the impact of implementing a 20 kV inter-transformer coupling on protection system performance and distribution reliability improvement, as indicated by changes in SAIDI, SAIFI, and CAIDI indices at Lumajang Substation. After the implementation of the 20 kV coupling between Transformer 2 and Transformer 3, the SAIDI index decreased from 5.93% to 2.636%, the SAIFI index declined from 137.97% to 72.30%, and the CAIDI index was reduced from 0.269% to 0.242%. Short-circuit current calculations and simulations show that the maximum fault current, represented by a three-phase fault, reaches 17.981 kA, while the minimum fault current, represented by a single-phase-to-ground fault, is 23.092 A. The results yield an OCR setting with an Ipickup of 0.625 A and a TMS of 0.1565 SI, as well as a GFR setting with an Ipickup of 0.1385 A and a TMS of 0.6092 SI. The fault clearing time of the OCR on the coupling is 0.4 seconds, while that of the GFR is 4 seconds. These values fall between the clearing times of the 20 kV incoming feeder and outgoing feeders, thereby satisfying protection coordination principles as verified through simulations using ETAP 19.0.1 software.

References

Mochammad Rizki Samputro, Arkhan Subari. 2019. “Simulasi Pelimpahan Beban Sistem PMT Kopel to Kopel pada Saat Pemeliharaan Trafo Berbasis Arduino Mega 2560 Menggunakan VT SCADA 11.2”, GEMA TEKNOLOGI Vol. 20 No.3 Periode April 2019 - Oktober 2019.

Binka Aji Wibowo, Saiful Manan, “Pemanfaatan PMT Kopel Sebagai Sarana Pengalihan Beban di Gardu Induk Sayung Kabupaten Demak”, GEMA TEKNOLOGI Vol. 18 No. 1 Periode April 2014 - Oktober 2014.

Abriansyah Hasyim, Muhammad Rizal, “Analisis Penggunaan Cubicle 20 kV Double Incoming dengan Automatic Transfer Switch (ATS) dalam Sistem Jaringan Distribusi 20 kV di Bandara Internasional Sultan Hasanuddin”, Fakultas Teknik, Universitas Muhammadiyah Makassar, 2019.

Ramadan Agung, Hermansyah Alam, “Analisis Perbandingan SAIDI-SAIFI pada Penyulang 20 kV Sebelum dan Setelah Pemeliharaan di PT PLN (Persero) ULP Meulaboh Kota”, Jurnal Serambi Engineering, Volume IX, No. 2, April 2025, p-ISSN : 2528-3561, e-ISSN : 2541-1934.

IEEE Std C37.04 - 2018, “IEEE Standard for Ratings and Requirements for AC High-Voltage Circuit Breaker with Rated Maximum Voltage Above 1000 V”, IEEE, 2018.

IEEE Std 242-2001, “IEEE Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems”, IEEE, 2001.

IEEE Std C37.91-2000, “IEEE Guide for Protective Relay Applications to Power Transformers”, IEEE, 2000.

IEEE Std 1366-2012, “IEEE Guide for Electric Power Distribution Reliability Indices”, IEEE, 2012.

IEC 60076-1, “Power Transformers - General’, IEC, 2000.

Stevenson Jr., William D. 1984. “Analisis Sistem Tenaga Listrik Edisi Keempat”, Jakarta Pusat: Penerbit Erlangga.

Pandjaitan, Bonar. 2012. “Praktik-Praktik Proteksi Sistem Tenaga Listrik”, Yogyakarta: Penerbit ANDI.

Bayu Andik Anggoro, Sukarno Budi Utomo, Ida Widihastuti, “Analisa Rugi-Rugi Daya dan Jatuh Tegangan pada Saluran Transmisi 150 kV GI Pati Bay GI Jekulo Menggunakan ETAP 12.6.0”, Elektrika, Vol. 12 No.2 Tahun 2020; hal 80-85.

PT PLN (Persero) PDM/PGI/01: 2014, “Buku Pedoman Pemeliharaan Transformator Tenaga”, PT PLN (Persero), 2014.

PT PLN (Persero) PDM/PGI/24: 2014, “Buku Pedoman Pemeliharaan Kubikel Tegangan Menengah”, PT PLN (Persero), 2014.

PT PLN (Persero) PDM/SGI/16: 2014, “Buku Pedoman Pemeliharaan Proteksi dan Kontrol Transformator”, PT PLN (Persero), 2014.

Downloads

Published

09-04-2026

How to Cite

Widodo, Y. A., Sari, R. D. J. K., & Arifuddin, R. (2026). Pengaruh Kopel 20 kV Antar Trafo terhadap Proteksi dan Keandalan Distribusi. Elposys: Jurnal Sistem Kelistrikan, 13(1), 24–29. https://doi.org/10.33795/elposys.v13i1.9210