Nowadays, Electricity is a important thing for people. As the load grown at the Bumicokro Substation, transformer I had replaced from 50 MVA to 60MVA. Because of that, the relays protection had to be resetting because of the changes of nominal current. Therefore, the objectives of this research are calculated and simulated the setting of OCR (Over Current Relay), GFR (Ground Fault Relay), SBEF (Stand by Earth Fault), differential and REF (Resistance Earth Fault) relay. ETAPv12.6 software is used to get the relay coordination Outgoing 22kV, Incoming 150kV, OCR (Over Current Relay), GFR (Ground Fault Relay), SBEF (Stand by Earth Fault), differential and REF (Resistance Earth Fault) after the calculation and simulation finished, then the result indicated the appropriate conditions to overcome the distrubance at the transformer according to the protection zone. The result of current setting for Differential relay is 2,88A, Primary REF is 0,5A, Secondary REF is 1,1A, 150kV OCR is 3,5A, and the moment setting is 28A, 22kV OCR 150kV 4,7A, GFR 1,44A, SBEF 1,0A. While, the result of time setting for Differential relay, Primary REF, Secondary REF are instant, for 150kV OCR is 1,06s, 22kV OCR is 1,07s, GFR 1,51s, and SBEF 8,8s.

References

Arismunandar, A dan Kuwahara. 1991. Buku Pegangan Teknik Tenaga Listrik Jilid II. Jakarta: PT. Pradnya Paramita.

Arismunandar, A dan Kuwahara. 1991. Buku Pegangan Teknik Tenaga Listrik Jilid III. Jakarta: PT. Pradnya Paramita.

Basri, H. 2002. Proteksi Sistem Tenaga Listrik. Jakarta: ITSN.

Grainger, J. John dan Stevenson W.D. 1994. Power System Analyss. Singapore.

Hermawan, A. 2008. Distribusi dan Transmisi Sistem Tenaga Listrik. Malang.

Karyana. 2013. Buku Pedoman dan Petunjuk Transmisi dan Gardu Induk Jawa-Bali. Jakarta.

Purnomo, H. 2016. Analysis Sistem Daya I. Malang.

Suhadi, dan Wrahatno T. 2008. Teknik Distribusi Tenaga Listrik Jilid I. Jakarta: Direktorat Pembinaan SMK.

Tim Review PT. PLN (Persero). 2010. Buku Pedoman Proteksi dan Kontrol Transformator. Jakarta.

Tim Review PT. PLN (Persero). 2010. Buku Pedoman Pemeliharaan Transformator Tenaga. Jakarta.

M. F. Hakim, S. Nurhadi, H. D. F. Amaral, S. L. Hermawan, “Kapasitor Shunt Sebagai Korektor Tegangan Bus di Gardu Induk”, elposys, vol. 10, no. 1, pp. 30–35, Feb. 2023.

S. I. Haryudo and U. T. Kartini, "Analisis Perbandingan Perhitungan Short Circuit Pada Gardu Induk 150/20 KV (Studi Kasus Pada Gardu Induk Manyar Gresik)," JURNAL TEKNIK ELEKTRO, pp. 507-515, 2021.

S. Nurhadi, M. F. Hakim, R. Joto, “Upaya Peningkatan Keandalan Penyulang dengan Manuver Jaringan”, elposys, vol. 10, no. 1, pp. 88–93, Feb. 2023.

N. Nursalim, A. S. Sampeallo, A. P. Willi, “Analisis Koordinasi Dan Setting Over Current Relay (OCR) Pada Pemakaian Daya Sendiri PLTU SMS Energy Menggunakan Software Etap 12.6. 0”, Media Elektro Journal, 97-106, 2019

G. RIZKY IRIANDO and A. IMAM AGUNG, “STUDI KOORDINASI SISTEM PROTEKSI PADA TRANSFORMATOR 20KV DI JARINGAN DISTRIBUSI 20KV PENYULANG BANDILAN”, JTE, vol. 8, no. 3, Jul. 2019

Downloads

Published

2023-06-14

How to Cite

Anang Dasa Novfowan, Mochammad Mieftah, & Heri Sungkowo. (2023). Analisis Koordinasi Relai Proteksi Transformator I 150/20kV GI Bumicokro Akibat Uprating Daya 50MVA Menjadi 60MVA. Elposys: Jurnal Sistem Kelistrikan, 10(2), 112–117. https://doi.org/10.33795/elposys.v10i2.2521