Kinerja Inverter 500 W untuk PLTS Skala Kecil

Authors

  • Slamet Nurhadi Politeknik Negeri Malang
  • Muhammad Fahmi Hakim Politeknik Negeri Malang
  • Ferdian Ronilaya Politeknik Negeri Malang
  • Sukamdi Politeknik Negeri Malang

DOI:

https://doi.org/10.33795/elposys.v11i1.5015

Keywords:

inverter, harmonisa, PWM

Abstract

At Electrical Engineering Department of Politeknik Negeri Malang, there is an EBT learning module in the form of solar panel with small capacity, namely 80 Watts. The only load that can be supplied is DC load because there isn’t installed inverter. Therefore, it is necessary to determine the inverter specifications to be installed in small-scale solar system. This research aims to determine the specifications and test the performance of a 500 W inverter integrated with a 50 Wp solar system. Also analyze power quality parameters and efficiency when connected to various load. The test method is no-load and load testing with the parameters measured including current, voltage, power, frequency and THD. Analysis was also carried out on the correlation between efficiency and loading and inverter pins with THDV and THDI. In the no-load test, the inverter output voltage waveform was obtained as a pure sine wave with a frequency of 50.10 Hz. In testing the LED and LHE loads, it was found that the inverter was good for use when the load was 50-80% of its capacity. The lowest THDV value is at a Pin value of 26 W, namely a THDV value of 0.009%. The highest THDV on the Pin is 130 W with THDV value of 1.9%. The lowest THDI value is at Pin 9.75 W, namely 27.6%. The highest THDI value on the 130 W Pin is 80.9%. The THD limit is still within the IEEE standard limit, namely 5% - 10%.

References

I. N. Syamsiana, S. S. Wibowo, M. F. Hakim, I. Ridzki dan R. Firjatoellah, “Energy Database Management System (EDBMS)-based data acquisition audit for electricity savings analysis,” dalam IOP Conference Series: Materials Science and Engineering, 2021.

M. B. Fadillah dan e. al., “Analisis Prakiraan Kebutuhan Energi Listrik Tahun 2015-2024 Wilayah PLN Kota Pekanbaru dengan Metode Gabungan,” Jurnal Online Mahasiswa Fakultas Teknik Universitas Riau, vol. 2, no. 2, pp. 1-10, 2015.

W. V. Siregar, “Prakiraan Kebutuhan Energi Listrik Kota Subulussalam Sampai Tahun 2020 Menggunakan Metode Analisis Regresi,” Rele (Rekayasa Elektrikal Dan Energi): Jurnal Teknik Elektro, vol. 1, no. 2, pp. 57-61, 2019.

M. F. (. Hakim, “Perancangan Rooftop Off Grid Solar Panel Pada Rumah Tinggal Sebagai Alternatif Sumber Energi Listrik,” Dinamika Dotcom: Jurnal Pengembangan Manajemen Informatika dan Komputer, 2017.

S. Nengsih, “Potensi Air Laut Aceh Sebagai Sumber Energi Listrik Alternatif,” CIRCUIT: Jurnal Ilmiah Pendidikan Teknik Elektro, vol. 4, no. 2, pp. 81-86, 2020.

M. Al Amin, “Sepeda Statis Sebagai Pembangkit Energi Listrik Alternatif Dengan Pemanfaatan Alternator Bekas,” Jurnal Edukasi Elektro, vol. 1, no. 2, 2017.

A. I. Ramadhan, E. Diniardi dan S. H. Mukti, “Analisis desain sistem pembangkit listrik tenaga surya kapasitas 50 WP,” Jurnal Teknik, vol. 37, no. 2, pp. 59-63, 2016.

S. Sukmajati dan M. Hafidz, “Perancangan dan analisis pembangkit listrik tenaga surya kapasitas 10 MW on grid di Yogyakarta,” Energi & Kelistrikan, vol. 7, no. 1, pp. 49-63, 2015.

P. R. Utami dan M. Wijayanti, “Analisa Perhitungan Pembangkit Listrik Tenaga Surya untuk Taman Markisa di Wilayah RT 01/RW 08 Kelurahan Mampang, Pancoran Mas, Kota Depok,” Jurnal Abdi Masyarakat Multidisiplin, vol. 1, no. 2, pp. 42-49, 2022.

Y. Suprihartini, T. Taryana dan R. Soebiantoro, “Desain Pembangkit Listrik Tenaga Surya Sistem Offgrid di Hangar Politeknik Penerbangan Indonesia Curug,” Jurnal Pendidikan Tambusai, vol. 7, no. 3, pp. 20776-20783, 2023.

V. Arnando, “Desain Sistem PLTS On-Grid pada Barbershop Gaul dengan menggunakan Helioscope,” Indonesian Journal of Electrical Engineering and Renewable Energy (IJEERE), vol. 3, no. 1, 2023.

D. Liestyowati, I. Rachman, E. Firmansyah dan M. Mujiburrohman, “Rancangan Sistem Pembangkit Listrik Tenaga Surya (PLTS) Berkapasitas 100 WP dengan Inverter 1000 Watt,” INSOLOGI: Jurnal Sains dan Teknologi, vol. 1, no. 5, pp. 623-634, 2022.

M. Yasin, F. A. Samman dan R. S. Sadjad, “Desain dan Analisis Inverter Tiga Fasa untuk Aplikasi Sistem PLTS Terhubung Grid PLN sebagai Referensi,” Jurnal Penelitian Enjiniring, vol. 21, no. 2, pp. 66-72, 2017.

M. Mulyadi, N. Hamzah, A. S. Yunus dan R. Effendy, “PENERAPAN PLTS SISTEM OFF-GRID UNTUK LAMPU PENERANGAN BANGUNAN PETERNAK AYAM RAS PETELUR,” dalam Seminar Nasional Terapan Riset Inovatif (SENTRINOV), 2023.

H. WIDIARTO dan A. SAMANHUDI, “RANCANGAN PEMANFAATAN TENAGA SURYA SEBAGAI SUMBER ENERGI DI GEDUNG POWER HOUSE BANDARA BANYUWANGI,” KNOWLEDGE: Jurnal Inovasi Hasil Penelitian dan Pengembangan, vol. 3, no. 3, pp. 195-204, 2023.

A. W. Nardi, “ANALISA PEMBANGUNAN PEMBANGKIT PLTS DESA TANAMALALA,” Kohesi: Jurnal Sains dan Teknologi, vol. 2, no. 7, pp. 69-89, 2024.

G. P. C. Handani, B. S. Gumilang dan A. Zuroida, “Perancangan Pembangkit Listrik Tenaga Surya (PLTS) untuk Suplai Daya Sistem Pemberian Pakan Ikan Otomatis,” ELPOSYS: Jurnal Sistem Kelistrikan, vol. 9, no. 3, pp. 183-187, 2022.

Downloads

Published

2024-02-22

How to Cite

Slamet Nurhadi, Muhammad Fahmi Hakim, Ferdian Ronilaya, & Sukamdi. (2024). Kinerja Inverter 500 W untuk PLTS Skala Kecil. Elposys: Jurnal Sistem Kelistrikan, 11(1), 19–24. https://doi.org/10.33795/elposys.v11i1.5015