Analisis Resetting Relay Dan Load Presentase Terhadap Pola Pelaksanaan Dan Pemeliharaan Pada Gardu Induk 150 Kv Saketi Banten

Authors

  • Ahmad Hermawan Politeknik Negeri Malang
  • Rhezal Agung Ananto Politeknik Negeri Malang
  • Rohmanu Dwi Kuncoro Politeknik Negeri Malang

DOI:

https://doi.org/10.33795/elposys.v8i2.632

Keywords:

OCR, Protection Relay, Normal Conditions, Maintenance conditions, load sharing

Abstract

The Saketi substation has three 150/70 kV power transformers with a capacity of 3x60 MVA with a frequency of 50 Hz
where all three transformers have the capacity, transformer 1 60 MVA (PAUWELS TRAFO) has 3 feeders with an average load of 300 A, 10 MW, transformer 2 60 MVA (UNINDO) has 3 feeders with an average load of 200 A, 6.9 MW and transformer 3 60 MVA (UNINDO) has 4 feeders with an average load of 300 A, 10 MW. This calculation and simulation analysis is carried out aiming to find out the relay settings on each transformer under normal conditions and in a maintenance state on one of the transformers for a long period of time. From the results of the analysis and calculation, it was found that the OCR relay setting under normal conditions of the incoming 150 kV transformer transformers 1, 2, and 3 has a current setting value of 0.92 A and a time setting of 0.36 seconds. On the outgoing side the 20 kV transformers 1, 2, and 3 have a setting of 1,039 A and a time setting of 0.166 seconds.

References

Aslimeri. (2008) “Buku Teknik Transmisi Tenaga Listrik Jilid 2”.

Hakim, Fahmi Muhammad.(2017). “Gardu Induk”. Politeknik Negeri Malang.

PLN P3B JB.(2013).“Pedoman dan Petunjuk Sistem Proteksi Transmisi dan Gardu Induk Jawa Bali”. PLN.

SPLN 8-1. (1991).“Transformator tenaga”, PLN. [5] I Gusti Putu Arka.(2015). “Analisa Pengaruh Pemasangan

Directional Ground Relay (DGR) sebagai Pengaman Gangguan Fasa Tanah Penyulang 20 kV”, Politeknik Negeri Bali.

Gunawan, Indra. (2018). “Analisa Resetting Over Current Relay Dan Ground Fault Relay Pada Trafo 60 Mva 150/20

Kv Dan Penyulang 20 Kv Gardu Induk Padang Sambia”. Universitas Udayana.

Wahyu, Risa. (2015). “Studi Pengaruh Uprating Transformator Terhadap Sistem Proteksi Sisi Incoming Pada Gardu Induk Polehan”. Politeknik Negeri Malang.

Kuncahyo, Dwi Mochammad. (2017). “Analisis Setting Ground Fault Relay (GFR) Terhadap Sistem Pentanahan

Netral Transformator Menggunakan Metode Neutral Grounding Resistor (NGR) Pada Penyulang PLN Rayon Kuala Pembuang”, Institut Teknologi Nasional Malang.

PLN Jasa Pendidikan dan Pelatihan. (2013). “Pengenalan Kubikel 20 kV”, PLN.

Silitonga, Natanoel Ezra. (2018). “Analisa Pengaruh Gangguan Di Saluran150 Kv Tandes – Perak Terhadap Koordinasi Relay Proteksi”. Politeknik Negeri Malang.

Duta Distanta Duta Pratama. (2015). “Studi Koordinasi Sistem Pengaman Trafo Di Gardu Induk Blimbing”. Politeknik

Negeri Malang

Downloads

Published

2021-06-30

How to Cite

Hermawan, A., Ananto, R. A., & Kuncoro, R. D. . (2021). Analisis Resetting Relay Dan Load Presentase Terhadap Pola Pelaksanaan Dan Pemeliharaan Pada Gardu Induk 150 Kv Saketi Banten. Elposys: Jurnal Sistem Kelistrikan, 8(2), 50–56. https://doi.org/10.33795/elposys.v8i2.632