Published: June 20, 2020

OPTIMASI TIPE DAN JUMLAH RUMAH PADA PROYEK PERUMAHAN ROYAL PANDAAN

1-6 Junaidi Ajizan, Susapto, Agus Sugiarto

OPTIMASI JUMLAH OPERATOR ALAT BERAT PADA PEKERJAAN STRUKTUR PROYEK APARTEMEN X MENGGUNAKAN DYNAMIC PROGRAMMING METHOD

7-15 Taufan Adhi Putra, Sitti Safiatus Riskijah, Joko Setiono

PENAMBAHAN SERAT LIMBAH BUBUT BESI TERHADAP KUAT TARIK DAN KUAT LENTUR BETON NORMAL

16-23 Bayu Pratama, Akhmad Suryadi, Gerard Aponno

PERENCANAAN ULANG PEKERASAN LENTUR HOLDINGBAY PADA AREA N1 DAN N7 BANDAR UDARA INTERNASIONAL JUANDA SURABAYA DENGAN METODE CBR

24-29 Mochammad Avi Febriansyah, Dwi Ratnaningsih, Udi Subagyo

PERENCANAAN SISTEM AIR BERSIH PADA PEMBANGUNAN TOWER CASPIAN APARTEMEN GRAND SUNGKONO LAGOON SURABAYA

30-37 Akhmad Rizal Kurniawan, Mohammad Zenurianto, Sunarto Suryanto

MANAJEMEN BEKISTING SEMI SISTEM PADA PROYEK APARTEMEN BEGAWAN MALANG

38-45 Abdillah Rizqon, Susapto, Djoko Trijanto

PERENCANAAN ULANG STRUKTUR RUMAH SUSUN DI KEDUNGWARU KABUPATEN TULUNGANGUNG

46-51 Catur Alkautsar I.J., Nawir Rasidi, Akhmad Suryadi

PENGARUH KESEHATAN DAN KESELAMATAN KERJA TERHADAP KECELAKAAN TENAGA KERJA PROYEK PEMBANGUNAN JALAN TOL

52-59 Annisa Aprilia, Sitti Safiatus Riskijah, Suhariyanto Suhariyanto

PERENCANAAN INSTALASI AIR BERSIH PADA GEDUNG KULIAH FAKULTAS ILMU KEOLAHRAGAAN UNIVERSITAS NEGERI MALANG

60-66 Chatrine Dhania Warta Wijaya, Mohammad Zenurianto, Armin Naibaho