Published: December 20, 2020

PERENCANAAN ULANG SISTEM DRAINASE JALAN RAYA SUKOHARJO – JALAN RAYA PENARUKAN KECAMATAN KEPANJEN KABUPATEN MALANG

1-5 Risa Nurisandira, Suhartono, Rinto Sasongko

STRATEGI DAN METODE PELAKSANAAN PEKERJAAN STRUKTUR OVERPASS PROYEK LANJUTAN PEKERJAAN AKSESIBILITAS BANDARA SOEKARNO - HATTA

6-12 Dionisius Padrawana Setya Purnama, Moch. Khamim, Muhamad Fajar Subkhan

EVALUASI SIMPANG TAK BERSINYAL DI JALAN AIRLANGGA – JALAN HAYAM WURUK MOJOSARI KABUPATEN MOJOKERTO PROVINSI JAWA TIMUR

13-17 Bayu Helmi Naufaldi, Udi Subagyo, Johanes Asdhi Poerwanto

EVALUASI KINERJA SIMPANG BERSINYAL DI JALAN BY PASS MOJOKERTO – JALAN GEMPOL MOJOKERTO – JALAN TOTOK KEROT – JALAN JAYANEGERA – JALAN KUWUNG MAGERSARI KOTA MOJOKERTO PROVINSI JAWA TIMUR

18-22 Mochamad Rois Amrirodiyan, Udi Subagyo, Johanes Asdhi Poerwanto

PERENCANAAN ULANG STRUKTUR ATAS JEMBATAN KOMPOSIT DENGAN MENGGUNAKAN GELAGAR CASTELLA BEAM (Studi Kasus Jembatan Rejosari, Kendenglembu, Banyuwangi)

23-29 Risky Andayani R., Sunarto Suryanto, Nawir Rasidi

PERENCANAAN CONCRETE SHEET PILE UNDERPASS KARANGLO SEKSI 4 SINGOSARI-JAWA TIMUR

30-35 Abdul Khamid, Dandung Novianto, Moch. Sholeh

OPTIMASI ALAT BERAT PADA PROYEK PEMBANGUNAN PENGENDALI BANJIR KALI X KABUPATEN BLITAR

36-41 Lely Dwi Oktavia, Sitti Safiatus Riskijah, Dyah Lydianingtyas

KAJIAN ULANG STUDI KELAYAKAN TEKNIS DAN FINANSIAL PERUMAHAN HANAMI KABUPATEN SIDOARJO

42-48 Salsabila Rahmi, Sumardi, Suhariyanto

OPTIMASI KEBUTUHAN TENAGA KERJA PADA PROYEK PEMBANGUNAN GEDUNG X DENGAN METODE DYNAMIC PROGRAMMING

49-54 Satria Akbar Gumelar, Sitti Safiatus Riskijah, Suselo Utoyo

PROJECT PLANNING PROYEK PEMBANGUNAN GEDUNG HOTEL XYZ KOTA MALANG

55-60 Dwi Rohmat Setyawan, Sitti Safiatus Riskijah, Sugiharti

EKSPERIMENTAL PENYEMPURNAAN TUMPUAN JENIS BASE ISOLATION UNTUK MEREDUKSI PENGARUH GEMPA PADA MODEL PORTAL BAJA.

61-66 Ahmad Kahfi Firdausi, Taufiq Rochman, Sunarto Suryanto

ANALISA KARAKTERISTIK MARSHALL DENGAN LIMBAH PLASTIK PP SEBAGAI SUBSTITUSI AGREGAT HALUS PADA LASTON AC-WC

67-72 Syafik Safira Febrianti, Akhmad Suryadi, Sugeng Riyanto

ANALISA KELAYAKAN FINANSIAL PROYEK PEMBANGUNAN RUSUNAWA PONDOK BENOWO INDAH SURABAYA

73-78 Diah Ayu Kusriandono, Sumardi, Sudarmanto

ANALISIS DEBIT BANJIR PADA SUNGAI BUNTUNG DI KABUPATEN SIDOARJO

79-84 Rifqi Arif Sulhan, Medi Efendi, Ratih Indri Hapsari

EVALUASI DAN PERENCANAAN SISTEM DRAINASE PADA RUAS JALAN ALTERNATIF SINGOSARI – PAKIS KABUPATEN MALANG

85-90 Mohammad Alif Dio Riskiansyah, Agus Suhardono, Sutikno

PERBANDINGAN TEBAL LAPIS PERKERASAN KAKU METODE BINA MARGA 2003 DAN METODE MANUAL DESAIN PERKERASAN 2017 (BINA MARGA) PADA TOL PANDAAN – MALANG STA. 30+625 s/d 38+488

91-96 Elok Ciptia Ramadhani, Udi Subagyo, M. Fajar Subkhan

PERENCANAAN PORTAL BETON BERTULANG TAHAN GEMPA SRPMK PADA KANTOR KECAMATAN PAGU KABUPATEN KEDIRI

97-102 Diana Dwiyanti, Armin Naibaho, Djoko Trijanto

ANALISIS KELAYAKAN PROYEK PEMBANGUNAN CLUSTER SAGUARA RESORT VILLA PERUMAHAN TAMAN DAYU KECAMATAN PANDAAN

103-108 Hardianto Dwi Prayitno, Sitti Safiatus Riskijah, Fadjar Purnomo

PENGARUH PEMANFAATAN LIMBAH CANGKANG KERANG DARAH SEBAGAI SUBSTITUSI SEMEN TERHADAP KUAT TEKAN DAN MODULUS ELASTISITAS BETON NORMAL FC’20

109-114 Putra Akhmad Rizki Tri Adinda, Qomariah, Sugeng Riyanto

ALTERNATIF PROJECT PLANNING PEMBANGUNAN GEDUNG SCIENCE POLICY AND COMMUNICATION UNIVERSITAS JEMBER

115-121 Rizqy Firdaus, Susapto, Sunarto Suryanto

EXTERNAL PRESTRESSING PADA STRUKTUR ATAS OVERPASS KLOPO SEPULUH KABUPATEN SIDOARJO MENGGUNAKAN BOX GIRDER POST TENSIONING

122-127 Amanda Elvira Asha, Sugiharti, Nawir Rasidi

PERENCANAAN ULANG JALAN TOL PANDAAN – MALANG RUAS PAKIS – MADYOPURO STA. 30+625 – STA. 38+488

128-133 Bariq Kurnia Sandi, Marjono, Rinto Sasongko

PERENCANAAN DRAINASE BERWAWASAN LINGKUNGAN DI DAS KALI PURWANTORO KOTA MALANG

134-140 Rakhmatul Laily Pradana, Ratih Indri Hapsari, Suhartono

STRATEGI PELAKSANAAN PROYEK PENGGANTIAN JEMBATAN SEI ALALAK BANJARMASIN

141-144 Khoirina Putri Izza Rohmah, Suhariyanto, Taufiq Rochman

PERBANDINGAN BOX GIRDER DENGAN I-GIRDER MENGGUNAKAN METODE BALANCED CANTILEVER PADA JALAN TOL PANDAAN-MALANG STA. 35+380

145-150 Rahma Maulidia Arzanti, Nawir Rasidi, Suhariyanto

PERENCANAAN GEOMETRIK JALAN NASIONAL TANAH MERAH – JALAN NASIONAL SURAMADU KABUPATEN BANGKALAN, MADURA

151-156 Muhammad Faridun Arif, Burhamtoro, Moch. Khamim

PENGARUH VARIASI NILAI FAS TERHADAP KUAT TEKAN BETON RINGAN DENGAN AGREGAT PECAHAN BATU BATA KLINKER

157-163 Yogha Sary Ariefiantho J, Sugeng Riyanto, Joko Trijanto

PERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH KOMUNAL PADA PERUMAHAN BUKIT SHANGRILLA ASRI KABUPATEN MALANG

164-169 Alvianda Yuliotitan Cristiantoro, Ratih Indri Hapsari, Utami Retno Pudjowati