Published: June 20, 2021

PECAHAN GENTENG KERAMIK SEBAGAI SUBSTITUSI AGREGAT KASAR DITINJAU DARI KUAT TEKAN DAN BERAT ISI BETON RINGAN

1-6 Iyz Haniuddin, Qomariah, Sunarto Suryanto

STRATEGI DAN METODE PEKERJAAN PEMANCANGAN TIANG PANCANG PROYEK DERMAGA TERMINAL PETIKEMAS BELAWAN SUMATERA UTARA

7-13 Affan Mashuri, Suhariyanto, Sumardi

PERENCANAAN SIMPANG BERSINYAL JALAN COKROAMINOTO – JALAN PATTIMURA – JALAN TRUNOJOYO KOTA MALANG

14-19 Nanda Yustiawinata, Udi Subagyo, Johanes Asdhi Poerwanto

ANALISIS KINERJA RUAS JALAN BENTENG PANCASILA AKIBAT PARKIR MOTOR ON STREET DI PUSAT PERTOKOAN JOKO SAMBANG KOTA MOJOKERTO JAWA TIMUR

20-26 Imelda Putri Octaviani, M. Fajar Subkhan, Rinto Sasongko

ANALISIS PENGGUNAAN TOWER CRANE UNTUK PEKERJAAN STRUKTUR PADA PROYEK ONE SIGNATURE GALLERY SURABAYA

27-34 Riszki Ari Pangestu, Suselo Utoyo, Diah Lydianingtias

PROJECT PLANNING PEMBANGUNAN PASAR PON KABUPATEN TRENGGALEK PROVINSI JAWA TIMUR

35-40 Dewi Fatmawati, Suhariyanto, Agus Sugiarto

ANALISIS KOORDINASI SINYAL ANTAR SIMPANG JALAN RANUGRATI DAN SIMPANG JALAN MAYJEN M. WIYONO KOTA MALANG

41-46 Sadana Devita Hapsari, Dwi Ratnaningsih, Udi Subagyo

PERENCANAAN ULANG PROFIL BAJA JEMBATAN MERAH PATIKRAJA KABUPATEN BANYUMAS MENGGUNAKAN RANGKA BAJA TIPE “K” TRUSS

47-52 Rifandi Harmianto, Armin Naibaho, Sudarmanto

PERENCANAAN DRAINASE DAN SUMUR RESAPAN PADA PERUMAHAN KEDIRI FAMILY RESIDENCE

53-59 Fitra Ahmad Safi’i, Ratih Indri Hapsari, Agus Suhardono

PERENCANAAN STUKTUR PORTAL BANGUNAN GUEST HOUSE 4 LANTAI DI JL. TIDAR KOTA MALANG

60-65 Balqis Addhuhatuz Zahroh, Sudarmanto, Joko Setiono

PERENCANAAN SISTEM AIR BERSIH PADA PEMBANGUNAN APARTEMEN SUNCITY SIDOARJO

66-71 Danang Wahyu Widihasta, Winda Harsanti, Moh. Charits

STRATEGI DAN METODE PELAKSANAAN PEKERJAAN PONDASI PADA PEMBANGUNAN TOWER BELLEROSA APARTEMEN SERPONG GARDEN TANGERANG

72-77 Catrya Ghazy Afif Tsany, Suhariyanto, Agus Sugiarto

ANALISA DEBIT KEBUTUHAN DAN RENCANA JARINGAN PENGEMBANGAN PIPA AIR BERSIH DI KECAMATAN PRINGKUKU KABUPATEN PACITAN

78-83 Selvia Rahma Sihkusuma, Agus Suhardono, Sutikno

PERENCANAAN ULANG SALURAN DRAINASE JALAN RAYA SEGENGGENG – JALAN RAYA CURUNGREJO KABUPATEN MALANG

84-88 Camila Faradiba Adehan, Winda Harsanti, Agus Suhardono

RANCANGAN SUMUR RESAPAN SEBAGAI USAHA KONSERVASI AIR DI KAMPUS POLITEKNIK NEGERI MALANG

89-92 Nurul Tsanny Putri Agustin, Ratih Indri Hapsari, Moh. Charits

DESAIN SISTEM JARINGAN DAN DISTRIBUSI AIR BERSIH DI KECAMATAN NGETOS KABUPATEN NGANJUK

93-98 Binti Istiqomatul Husna, Agus Suhardono, Sutikno

PERENCANAAN GEOMETRIK RELOKASI JALAN PROVINSI NGANJUK-BOJONEGORO DARI DESA SAMBIKEREP SAMPAI DESA PAJENG

99-104 Achmad Johan Adianto, Marjono, Muhamad Fajar Subkhan

PERBANDINGAN ERECTION PCI GIRDER MENGGUNAKAN CRAWLER CRANE DAN GANTRY LAUNCHER PADA PROYEK JEMBATAN TELUK KENDARI

105-110 Dewi Garnis Pandji, Fadjar Purnomo, Wahiddin Wahiddin

OPTIMALISASI LAHAN PARKIR RSUD. KANJURUHAN, KABUPATEN MALANG.

111-116 Siska Handayani, Rinto Sasongko, Udi Subagyo

ANALISIS PERBANDINGAN APLIKASI FASAD DINDING PRACETAK DENGAN DINDING KALSICLAD 12 PADA TOWER X PROYEK APARTEMEN Y SURABAYA

117-123 Dara Oktarinda, Sitti Safiatus Riskijah, Nawir Rasidi

PEMELIHARAAN SALURAN DRAINASE BLOK C-1 DI PERUMAHAN SAWOJAJAR KOTA MALANG - MRK

124-128 Muhammad Risqil Machasin, Ratih Indri Hapsari, Moh. Charits

PERENCANAAN ULANG JARINGAN PIPA DISTRIBUSI AIR BERSIH DENGAN PROGRAM WATERCAD DI KECAMATAN SUKUN KOTA MALANG PROVINSI JAWA TIMUR

129-135 Gisela Nadia Ramadhanty, Utami Retno Pudjowati, Medi Efendi

PERENCANAAN ULANG STRUKTUR ATAS DAN UTAMA GEDUNG PERKANTORAN BUMI MANDIRI SURABAYA JAWA TIMUR

136-142 Chynthya Novita Raga, Agus Sugiarto, Wahiddin Wahiddin

PERENCANAAN ULANG PEMBANGUNAN JALAN LAYANG BOX GIRDER JALAN AKSES BANDARA JENDERAL AHMAD YANI SEMARANG

143-148 Salimur Rizqa, Armin Naibaho, Susapto

KAJIAN RENCANA BIAYA DAN PENJADWALAN JALAN TOL PEMATANG PANGGANG – KAYU AGUNG STA. 112+600 – 120+600

149-153 Nur Yuwono Aji, Susapto, Marjono

PERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH (IPAL) DENGAN SISTEM KOMUNAL DI KAWASAN DINOYO KECAMATAN LOWOKWARU KOTA MALANG

154-157 Nisrina Salma. M, Utami Retno Pudjowati

METODE PELAKSANAAN PERBAIKAN TANAH MENGGUNAKAN METODE PRELOADING DAN PREFABRICATED VERTICAL DRAIN (PVD) PADA TERMINAL INTERNASIONAL KIJING PONTINAK

158-162 Chandra Adinegoro, Moch. Sholeh, Dandung Novianto

PENGARUH PENAMBAHAN BOTTOM ASH TERHADAP NILAI CBR SEBAGAI BAHAN STABILISASI TANAH LEMPUNG DI BADEAN, BONDOWOSO

163-166 Mareta Windia Prahesti, Moch. Sholeh, Sugeng Riyanto

PERENCANAAN BALOK PRATEGANG TOWER SYARIAH UNIVERSITAS AIRLANGGA SURABAYA

167-174 Pamungkas Imanda, Sudarmanto, Djoko Trijanto

PENGARUH LIMBAH BAN KARET SEBAGAI SUBSTITUSI PASIR TERHADAP KUAT TEKAN DAN MODULUS ELASTISITAS BETON

175-181 Dica Hermawan Setiaji, Sugeng Riyanto, Dandung Novianto