Published: September 19, 2024

UPAYA SPEED UP PEMASANGAN TULANGAN KOLOM DENGAN MOBILE CRANE PEMBANGUNAN GEDUNG AC POLINEMA TAHAP II

1-4 Algina Dia Tasya, Rosyidah Auliya Haqiqi Nasution, Deni Putra Arystianto

KELAYAKAN FINANSIAL DALAM PERENCANAAN PEMBANGUNAN JALAN TOL MALANG-KEPANJEN

5-13 Hifzhan Muhammad hifzhan Azh zhafir, Burhamtoro, Muhammad Fajar Subkhan

ANALISIS KERUSAKAN JALAN BERDASARKAN METODE INDEKS KONDISI PERMUKAAN (IKP) PADA JALAN IR. SOEKARNO KOTA BATU

14-21 Nida Athiyyah Husniyah, Nain Dhaniarti R., Moch. Sholeh

EVALUASI KINERJA WAKTU DAN BIAYA PADA PROYEK GEDUNG X MENGGUNAKAN METODE EARNED VALUE ANALYSIS - MRK

22-27 Wafi Damar Rachman, Suselo Utoyo, Sitti Safiatus Riskijah

PERBANDINGAN PERENCANAAN DAN METODE PELAKSANAAN FONDASI TIANG BOR DENGAN FONDASI TIANG PANCANG PADA GEDUNG RSUD BANGIL

28-35 Utari Nindy Safira, Moch. Sholeh, Wahiddin

SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) PADA PROYEK GEDUNG AKUNTANSI DAN ADMINISTRASI NIAGA POLITEKNIK NEGERI MALANG

36-41 Muhammad Tri Budi Septiawan, Muhammad Faishal Bagoes Aurino, Deni Putra Arystianto

PERENCANAAN BEKISTING DAN PERANCAH PADA PROYEK MALL LAGOON AVENUE SUNGKONO SURABAYA

42-50 Muhammad Rifqi Hardiyanto, Sudarmanto, Suselo Utoyo

PENGARUH PENAMBAHAN FLY ASH TERHADAP KARAKTERISTIK CAMPURAN LAPISAN ASPAL BETON (LASTON)

51-58 Gesang panggayuh, Akhmad Suryadi, Agus Sugiarto

STUDI PERENCANAAN ULANG STRUKTUR KOLOM GEDUNG LABORATORIUM TERPADU AKN “PUTRA SANG FAJAR“ BERBASIS GFRP SEBAGAI SUBTITUSI TULANGAN KONVENSIONAL

59-66 Ega Fatria, Sugeng Riyanto, Bobby Asukmajaya R

ANALISIS KERUNTUHAN TUBUH BENDUNGAN AKIBAT OVERTOPPING PADA BENDUNGAN GINTUNG KABUPATEN PURBALINGGA ALTERNATIF 1

67-74 Mohammad Zulfan Dwi Saputra, Ayisya Cindy Harifa, Moh.Charits

OPTIMASI DAN EVALUASI JARINGAN IRIGASI PADA DAERAH IRIGASI SUMBER NGEPOH KECAMATAN LAWANG KABUPATEN MALANG

75-81 Yurike Dina Apriliana, Winda Harsanti, Agus Suhardono

PERENCANAAN JARINGAN DRAINASE BERWAWASAN LINGKUNGAN PADA JALAN RAYA DONOMULYO SAMPAI JALAN TRISULA KECAMATAN DONOMULYO KABUPATEN MALANG

82-86 Alfian Eka Winanto Winanto, Sutikno, Winda Harsanti

ANALISIS PERBAIKAN STABILITAS LERENG DENGAN METODE KOMBINASI VEGETASI DAN SOIL NAILING DI AREA PROYEK SPILLWAY BENDUNGAN TUGU KABUPATEN TRENGGALEK

87-94 Annisa Dewi Rahmawati, Moch. Sholeh, Bobby Asukmajaya R.

OPTIMASI LAHAN PARKIR TERHADAP PENDAPATAN PARKIR DI GOLDEN SWALAYAN KOTA KEDIRI

95-109 Shafa Wellin Astono, Marjono, Fadjar Purnomo

PERENCANAAN STRUKTUR JEMBATAN PRATEGANG PROFIL I GIRDER PADA JEMBATAN LEMBAH DIENG KOTA MALANG

110-117 Alvien Saher Gaza Provanda, Nawir Rasidi, Wahiddin

PENGARUH SERAT KAWAT BENDRAT PADA BETON NORMAL TERHADAP PERFORMA BETON (KUAT TEKAN DAN KUAT LENTUR)

118-124 Celya Dwi Agnantasya, Qomariah, Agustin Dita Lestari

OPTIMASI PENGGUNAAN ALAT BERAT PADA PROYEK PEMBANGUNAN JALAN BARU PLANJAN BARU TEPUS KABUPATEN GUNUNG KIDUL STA 0+000 – STA 4+325

125-139 Andini Indah Permadani Andini, Susapto, Sitti Safiatus Riskijah

MORTAR GEOPOLIMER MUTU TINGGI BERBASIS FLY ASH DAN SILICA FUME : APLIKASINYA TERHADAP KUAT TEKAN DAN KUAT LENTUR

140-143 Muchammd Khafid Syafril Waliyyuddin, Taufiq Rochman, Akhmad Suryadi

MODIFIKASI PERENCANAAN STRUKTUR GEDUNG MALANG CREATIVE CENTER MENGGUNAKAN KING CROSS COLUMN DAN CASTELLATED BEAM

144-151 Samir Umar Bagazi, Akhmad Suryadi, Aulia Rahman

PERENCANAAN ULANG GEOMETRIK DAN PERKERASAN JALAN BATA-TEGALJATI KECAMATAN SUMBERWRINGIN KABUPATEN BONDOWOSO

152-157 Tata Kusuma Putri, Udi Subagyo, Martince Novianti Bani

EVALUASI KINERJA SIMPANG BERSINYAL PADA SIMPANG TERMINAL MOJOAGUNG KABUPATEN JOMBANG

158-163 Abdul Muizzi, Marjono, Dwi Ratnaningsih

KINERJA CAMPURAN FLY ASH DAN SAMPAH PLASTIK (POLYETHYLENE) TERHADAP KUAT TEKAN BETON

164-168 Nismara Arsya Shavira, Agustin Dita Lestari, Sugeng Riyanto

EVALUASI TINGKAT DAN PENANGANAN KERUSAKAN MENGGUNAKAN PENENTUAN INDEKS KONDISI PERKERASAN (IKP) Pd 01-2016-B PADA JALAN RAYA KIAGENG GRIBIG-MAYJEN SUNGKONO KOTA MALANG

169-176 Ferryco Harnaputro, Burhamtoro, Udi Subagyo

DESAIN ULANG STRUKTUR GEDUNG KELAS & LAB PUPR SEMARANG MENGGUNAKAN PERFORMANCE BASED DESIGN

177-183 Akhmad Khairil, Wahiddin, Anisah Nur Fajarwati

PENGARUH AIR LAUT TERHADAP KUAT TEKAN BETON GRADASI SENJANG DENGAN CAMPURAN BUBUT ALUMINIUM SEBAGAI EXPANSIVE AGENT

184-191 Ageng Maulana Wirawan, Zhang Yichao

PROJECT PLANNING PEMBANGUNAN GEDUNG PELAYANAN UTAMA RUMAH SAKIT X KOTA MALANG

192-199 Ridho Rachman, Sitti Safiatus Riskijah, Susapto

PERENCANAAN ULANG SISTEM DRAINASE BERWAWASAN LINGKUNGAN PADA JL. TRUNOJOYO – JL. SOEKARNO HATTA KABUPATEN PONOROGO

200-207 Maulid Diana Putri, Ikrar Hanggara, Moh. Charits

PERENCANAAN SISTEM JARINGAN DAN DISTRIBUSI AIR BERSIH AIR BERSIH KECAMATAN SEDATI KABUPATEN SIDOARJO

208-213 Fawwas Cahya Aldriansyah, Agus Suhardono, Chairul Muharis

PENGARUH EKSTRAKSI SERBUK BENTONITE PADA SUBTITUSI SEMEN TERHADAP KUAT TEKAN MUTU BETON

214-218 Salsabila Naura Rahma, Agus Sugiarto, Agustin Dita Lestari

PERENCANAAN ULANG SALURAN DRAINASE PERUMAHAN PONDOK PERMATA SUCI KECAMATAN MANYAR KABUPATEN GRESIK

219-224 Andika Ramadhani, Aisyah Cindi Harifa, Utami Retno Pudjowati

ANALISA DAMPAK BEBAN KENDARAAN DAN LALU LINTAS HARIAN RATA-RATA TERHADAP JALAN RAYA PASURUAN

225-232 Ariel Rizky Putra Balantimuhe, Supiyono, Ahmad Suryadi

PENYUSUNAN PROJECT PLANNING PEMBANGUNAN PROYEK SPILLWAY BENDUNGAN X KABUPATEN X

233-239 Andy Wijaya, Sitti Safiatus Riskijah, Suselo Utoyo

ANALISIS KELAYAKAN FINANSIAL PROYEK PEMBANGUNAN JALAN TOL ABCD SEKSI 4

240-245 Rofika Adawiyah, Sitti Safiatus Riskijah, Diah Lydianingtias

EVALUASI PELAKSANAAN SISTEM MANAJEMEN KESELAMATAN, KESEHATAN KERJA DAN LINGKUNGAN (SMK3L) PADA PROYEK INFRASTRUKTUR DASAR SANUR

246-251 Dewi Nabilah Widayanti, Radhia Jatu Noviarsita Sakti, Diah Lydianingtyas

PERENCANAAN SISTEM AIR BERSIH DAN AIR BUANGAN PADA PEMBANGUNAN GEDUNG KANTOR BCA KCU BUKIT DHARMO GOLF SURABAYA

252-260 Degita Destiara Pramadania, Winda Harsanti, Agus Suhardono

OPTIMASI PENGGUNAAN ALAT BERAT PADA PROYEK JALUR LINTAS SELATAN LOT 7 BLITAR STA 6+00 – STA 12+625

261-267 Syafira Oktaviani, Diah Lydianingtias, Fadjar Purnomo

ANALISIS PRODUKTIVITAS PEKERJAAN ARSITEKTUR PADA PEMBANGUNAN APARTEMEN KLASKA RESIDENCE SURABAYA

268-274 Muchammad alvian najib, Sumardi, Suselo Utoyo

KAJIAN U TURN DI JALAN SOEKARNO HATTA MALANG (STUDI KASUS DEPAN TAMAN KRIDA) DENGAN METODE PKJI 2023

275-280 Mohammad Riang Firmansyah, Supiyono, Udi Subagyo

EVALUASI KINERJA SIMPANG PADA JALAN MARTADINATA KOTA MALANG

281-285 Doni Akbar Ferdiansah, Supiyono, Sugeng Riyanto

PERENCANAAN BIAYA DAN JADWAL PELAKSANAAN PROYEK PEMBANGUNAN PABRIK ROKOK KALENG GUDANG GARAM SKM UNIT 5 KEDIRI

286-291 Fitrianto Supramono, Fadjar Purnomo, Djoko Trijanto

MODIFIKASI PERENCANAAN STRUKTUR JEMBATAN BETON PRATEGANG JALUR LINTAS SELATAN TRENGGALEK – TULUNGAGUNG STA 6+900

292-299 Fio Ayubi Qilail, Bobby Asukmajaya R., Akhmad Suryadi

PERENCANAAN ULANG JARINGAN DRAINASE PADA JL. URIP SUMOHARJO – JL. KI AGENG GRIBIG KOTA MALANG

300-304 Nawang Antonia Nariswari, Winda Harsanti, Ikrar Hanggara

STUDI KELAYAKAN PROYEK PEMBANGUNAN CLUSTER ASERA NISHI KOTA HARAPAN INDAH BEKASI

305-310 Muhammad Abinurwianto, Moch Khamim, Susapto

ANALISIS HIGHEST AND BESTUSE PADA LAHAN KOSONG DI JALAN ADBUL GANI ATAS KOTA BATU

311-318 Nuruddin Habibi, Sitti Safiatus Riskijah, Deni Putra Arystianto

PROJECT PLANNING PEMBANGUNAN GEDUNG MTH 27 OFFICE SUITE JAKARTA TIMUR

319-324 Rizky Setya Efendy, Diah Lydianingtyas, Suselo Utoyo

PERENCANAAN ULANG GEOMETRIK JALAN JALUR LINTAS SELATAN LOT 7 MENGGUNAKAN PEDOMAN GEOMETRIK 2021

325-330 Nizhar Abrar Al. Afghany, Dwi Ratnaningsih, Rinto Sasongko

PERENCANAAN BEKISTING DAN PERANCAH PROYEK PEMBANGUNAN GEDUNG 2 ITB INNOVATION PARK KOTA BANDUNG

331-336 Febriansyah Ainur Rofiq -, Suhariyanto, Agus Sugiarto

PERENCANAAN ULANG STRUKTUR ATAS JEMBATAN PRATEGANG PULUHAN PADA RUAS JALAN TOL SOLO - KLATEN

337-344 Dindi Putri Azzahra, Aulia Rahman, Deni Putra Arystianto

ANALISIS PERBANDINGAN FONDASI TIANG PANCANG DAN TIANG BOR PADA GEDUNG KANTOR PT. UBS SURABAYA

345-350 Yulinda Sukma Anggraini, Moch. Sholeh, Dandung Novianto