Published: September 25, 2023

ANALISA PENGGUNAAN ZEOLITE SEBAGAI SUBSTITUSI PASIR TERHADAP KUAT TEKAN BETON NORMAL

1-9 Gilang Devialdy, Akhmad Suryadi, Agus Sugiarto

EVALUASI SIMPANG TIDAK BERSINYAL PADA SIMPANG TIGA JALAN RAYA MLIRIP KABUPATEN MOJOKERTO

10-15 Harisa Gea Pratama, Dwi Ratnaningsih, Johanes Asdhi Poerwanto

PERENCANAAN ULANG STRUKTUR GEDUNG INTEGRASI RUMAH SAKIT JIWA MENUR SURABAYA

16-21 Abdullah Salim Said, Akhmad Suryadi, Nawir Rasidi

PERENCANAAN SIMPANG BERSINYAL JALAN TLOGO – SERUT KECAMATAN NGUNUT KABUPATEN TULUNGAGUNG

Roky Amerosady, Johanes Asdhi Poerwanto, Udi Subagyo

OPTIMASI LAHAN DAN STUDI KELAYAKAN PERUMAHAN MEDINA RESIDENCE CLUSTER AL HAMRA

27-34 Elvina Lestari, Fadjar Purnomo, Radhia Jatu Noviarsita Sakti

PERENCANAAN ULANG GEOMETRIK JALUR LINTAS SELATAN PANTAI SINE PUCANG LABAN BATAS KABUPATEN BLITAR

35-42 Nabila Shafa Ameera, Udi Subagyo, Agustin Dita Lestari

PERENCANAAN SISTEM INSTALASI AIR BERSIH DAN AIR KOTOR PADA GEDUNG FAMBAM ACADEMY SPORT JAKARTA

43-48 Cindy Andre Aswari, Sutikno Sutikno, Ayisya Cindy Harifa

EVALUASI KONDISI PERMUKAAN JALAN TOL PROF. DR. IR. SEDYATMO DENGAN METODE BINA MARGA

49-54 Della Destalia Koeswardilla, Marjono Marjono, Qomariah Qomariah

ANALISIS KERUSAKAN JALAN BERDASARKAN METODE BINA MARGA PADA JALAN RAYA PAJARAKAN-KRAKSAAN KABUPATEN PROBOLINGGO

55-61 Ilmatus Sa'diyah, Marjono Marjono, Supiyono Supiyono

EVALUASI PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA PROYEK PEMBANGUNAN JALAN TOL SERANG-PANIMBANG SEKSI 2

62-69 Noviya Safarah, Joko Setiono, Moch. Khamim

ANALISIS CLASH DETECTION DAN QUANTITY TAKE OFF STRUKTUR ATAS GEDUNG B RSUD KRIAN MENGGUNAKAN METODE BIM

70-77 Khusnul Aldi Saputra, Bobby Asukmajaya Raharjo, Anisah Nur Fajarwati

PEMANFAATAN LIMBAH PLASTIK SEBAGAI PENGUAT BETON RESIN FLY ASH

78-81 Muhammad Haqqi Musthafa Kamil, Taufiq Rochman, Wahiddin Wahiddin

PROJECT PLANNING PEMBANGUNAN RUMAH SAKIT NASIONAL MALANG

82-88 Junieta Ayu Winnanda, Diah Lydianingtias, Sumardi Sumardi

PERENCANAAN INSTALASI AIR BERSIH DAN AIR BUANGAN PADA MENARA 17 PWNU JAWA TIMUR

89-94 Dania Silsilatu Nissa, Sutikno Sutikno, Deni Putra Arystianto

ANALISA MANAJEMEN RISIKO PADA PROYEK PEMBANGUNAN GEDUNG APARTEMEN THE NEWTON 2 TERHADAP KETEPATAN WAKTU PELAKSANAAN

95-102 Zahwa Lintang Ayu Hidayati, Fadjar Purnomo, Bobby Asukmajaya Raharjo

ANALISIS DESAIN FONDASI TIANG BOR PADA PEMBANGUNAN GEDUNG UKM POLITEKNIK PEKERJAAN UMUM KOTA SEMARANG

103-110 Nurul Fitriyah, Moch. Sholeh, Dandung Novianto

COMPARISON BETWEEN CONCENTRIC BRACING FRAME AND ECCENTRIC BRACING FRAME IN EARTHQUAKE-RESISTANT HIGH-RISE BUILDINGS

111-116 Mohammedalameen Ahmed Aldaw Alhussein, Wahiddin Wahiddin, Akhmad Suryadi

PROJECT PLANNING PEMBANGUNAN OFFICE PROYEK ONE CAPITAL SURABAYA

117-123 Nurul Pratiwi, Dyah Lydianingtias, Radia Jatu Noviarsita Sakti

DEFECTS IDENTIFICATION OF SOEKARNO-HATTA BRIDGE

124-129 Yuda Nureksa, Suhariyanto Suhariyanto, Sumardi Sumardi

PERBANDINGAN METODE PELAKSANAAN ERECTION PCI GIRER PADA JEMBATAN JEBOL 2 PROYEK JALAN TOL SOLO-YOGYAKARTA

130-135 Riska Amalia Dewantari, Suhariyanto Suhariyanto, Nawir Rasidi

PERENCANAAN ULANG GEOMETRIK JALAN LINGKAR SELATAN KABUPATEN SAMPANG

136-142 Ipung Wisnu Triono, Udi Subagyo, Martince Novianti Bani

STUDI KELAYAKAN PEMBANGUNAN PERUMAHAN SUMBERPASIR REGENCY KECAMATAN PAKIS KABUPATEN MALANG

143-146 Chandra Mukti Pratama, Sumardi Sumardi, Susapto Susapto

STUDI KELAYAKAN PROYEK PEMBANGUNAN PERUMAHAN MUTIARA GARDEN KOTA PASURUAN

147-153 Lutfiah Putri Hediyanti, Sumardi Sumardi, Armin Naibaho

STUDI KELAYAKAN DAN PERENCANAAN DESAIN EMBUNG UNTUK AIR IRIGASI DESA WONOMULYO KECAMATAN PONCOKUSUMO

254-159 Jesica Natasha Surbakti, Ratih Indri Hapsari, Sugeng Riyanto

PROJECT PLANNING PROYEK PEMBANGUNAN RUMAH SAKIT KASIH IBU (RSKI) SURAKARTA, JAWA TENGAH

160-165 Mohammad Edwin Wibowo, Sumardi Sumardi, Susapto Susapto

EVALUASI KINERJA ANGKUTAN KERETA API JAYABAYA KELAS EKSEKUTIF RELASI STASIUN MALANG-STASIUN GUBENG SURABAYA

166-171 Rahmad Fajar A. Febrianto, Dwi Ratnaningsih, Achendri M. Kurniawan

EVALUASI KELAYAKAN TEKNIS DAN FINANSIAL PEMBANGUNAN GEDUNG APARTEMEN THE NEWTON 2 JAKARTA SELATAN

172-179 Hannis Wahyu Septiyani, Susapto Susapto, Joko Setiono

ANALISIS PERBANDINGAN FONDASI TIANG PANCANG DENGAN FONDASI TIANG BOR PADA GEDUNG KANTOR BUPATI PASURUAN

180-186 Rosalia Isna Putri, Mohamad Zenurianto, Moch. Sholeh

PERENCANAAN ULANG SALURAN DRAINASE DENGAN KOLAM RETENSI PEMUKIMAN DUSUN BALONGKORE KECAMATAN WONOASRI KABUPATEN MADIUN

187-194 Muhammad Rifa'i, Moh. Charits, Medi Efendi

ANALISIS PERBANDINGAN FONDASI BORED PILE DENGAN DRIVEN PILE PADA GEDUNG RAWAT INAP RSUD AR-ROZY PROBOLINGGO

195-202 Raihan Harijanto, Moch. Sholeh, Dandung Novianto

ANALISA KARAKTERISTIK BETON ASPAL DENGAN SUBSTITUSI LIMBAH PLASTIK HDPE MENGGUNAKAN GRADASI BM DAN BBA

203-207 Dewi Shinta Larasati, Qomariah Qomariah, Taufiq Rochman

PERENCANAAN JARINGAN PIPA TRANSMISI DAN DISTRIBUSI AIR BERSIH KECAMATAN GRABAGAN KABUPATEN TUBAN

223-229 Bileam Yerdan Nahak, Sutikno Sutikno, Ikrar Hanggara

STUDI KELAYAKAN TEKNIS DAN FINANSIAL PEMBANGUNAN APARTEMEN KYO SOCIETY KOTA SURABAYA

208-212 Jelita Rossa Ispratiwi, Diah Lydianingtias, Suselo Utoyo

PERENCANAAN ULANG STRUKTUR ATAS GEDUNG MENARA 17 PWNU JAWA TIMUR

213-219 Fadila Nur Rohmah, Armin Naibaho, Anisah Nur Fajarwati

MORTAR GEOPOLIMER MATERIAL PENYUSUN MORTAR BARU RAMAH LINGKUNGAN

220-222 Achmad Fauzi Musyafa', Taufiq Rochman, Aulia Rahman

PROJECT PLANNING PEMBANGUNAN APARTEMEN KYO SOCIETY SURABAYA

230-236 Kurniawan Febrianto, Radhia Jatu Noviarsitu Sakti, Sumardi Sumardi

PERENCANAAN ULANG JALAN PADA JALAN SIMPANG PENAWAR - GEDONG AJI BARU - RAWAJITU PROVINSI LAMPUNG

237-243 Styfani Yudianto Putri, Udi Subagyo, Aulia Rahman

ANALISIS STABILITAS LERENG SPILLWAY SISI KIRI BENDUNGAN BAGONG STA 0+225

244-250 Muhammad Dwi Cahyono, Moch. Sholeh, Mohamad Zenurianto

ALTERNATIF DESAIN FONDASI PADA PEMBANGUNAN GEDUNG DIREKTORAT POLITEKNIK PEKERJAAN UMUM (PU) SEMARANG

251-257 Ainun Safitri Mufida, Moch. Sholeh, Supiyono Supiyono

BETON RINGAN SEMBUH MANDIRI, SEBUAH MATERIAL BARU RAMAH LINGKUNGAN

258-260 Aldisar Yanuar, Taufiq Rochman, Deni Putra Arystianto

STUDI KELAYAKAN TEKNIS DAN FINANSIAL PEMBANGUNAN RUMAH SAKIT NATIONAL HOSPITAL MALANG

261-268 muhamadnaufalathalla wardhana, Diah Lydianingtias, Deni Putra Arystianto

PERENCANAAN BEKISTING DAN PERANCAH PADA PROYEK PEMBANGUNAN GEDUNG PASSENGER TERMINAL BUILDING BANDARA INTERNASIONAL DHOHO KEDIRI

269-274 Nikita Angelia Finit, Moch. Khamim, Armin Naibaho

PERENCANAAN BEKISTING DAN PERANCAH PADA PROYEK PEMBANGUNAN SII OFFICE SURABAYA

275-281 Anisa Putri Arindra, Fadjar Purnomo, Sugeng Riyanto

PERENCANAAN KEBUTUHAN LAHAN PARKIR SEPEDA MOTOR DI LAPANGAN WALL CLIMBING POLITEKNIK NEGERI MALANG

282-287 Viky Rafida Umami, Achendri M. Kurniawan, Nawir Rasidi

EVALUASI KINERJA SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA PASSENGER TERMINAL BUILDING PROYEK BANDARA DHOHO KEDIRI

288-295 Irgidwianti Gris Asmalda, Fadjar Purnomo, Deni Putra Arystianto

EVALUATION OF THE LEVEL DAMAGE OF FLEXIBLE PAVEMENT ON THE SINGOSARI – RANDU AGUNG HIGHWAY MALANG REGENCY

296-300 Urviy Sausan Listikhawa Urviy, Dwi Ratnaningsih, Sugeng Riyanto

OPTIMASI ALAT BERAT PADA PEKERJAAN GALIAN DAN TIMBUNAN PROYEK TOL PASURUAN-PROBOLINGGO STA 31+300 - 34+000

301-308 Ni Luh Gede Anjani Puspita Dewi, Fadjar Purnomo, Indah Ria Riskiyah

PENGGUNAAN RESIN UNTUK MENINGKATKAN KINERJA KUAT TEKAN MORTAR BERPENGUAT FLY ASH

309-312 Aris Wahyu, Taufiq Rochman, Bobby Asukmajaya

EVALUASI TINGKAT KERUSAKAN JALAN DAN PENANGANANNYA MENGGUNAKAN METODE SURFACE DISTRESS INDEX (SDI) PADA JALAN RAYA KEBON AGUNG - JALAN RAYA PEPEN KABUPATEN MALANG

313-318 Sheyhiya Mehita Monika Uzigita, Burhamtoro Burhamtoro, Supiyono Supiyono

ANALISIS SISA MATERIAL PADA PROYEK PEMBANGUNAN GEDUNG APARTEMEN THE NEWTON 2

Salsabila Sa'adia Yudha, Moch. Khamim, Akhmad Suryadi